The cone crusher cs160 commissioning precautions:
As we all know, each crusher installation should be short after load test so unreasonable, timely maintenance.
1, before the start of the crusher should check the fastening of the main junction.
2, before the start of the hand plate moving pass part of the rotation of the hollow shaft at least 2-3 laps, to think flexibly limp neck phenomenon only when the car.
3, the crusher start to start the pump should be preceded by, to know each lubrication point lubricant see oil back to the tank before start Crusher.
4, the idle test continuous operation can not be less than 2 hours.
5, broken cone around its own centerline autobiography revolutions are not less than 15 rev / min.
6, the crusher cone revolutions may soon have a negative phenomenon, should be immediately stopped, corrected, at the same time, checks to the oil, and then re-test.
Therefore, the test of the cone crusher is very important.
The Philippines has abundant mineral resources, occupies an important position in the world reserves of mineral resources. According to the...
READ MOREPhilippines is rich in many kinds of mine resources, the granite resource reserve is very vast, the granite mining process...
READ MORELa combinación de la posición de trituración móvil en la solicitud de Arabia Saudita Planta movil de trituracion de modular...
READ MOREAs is well known that, Egypt is rich in many non-metal mineral resources, especially the gypsum reserves are very rich,...
READ MOREWith the economics greatly development, the government pay more attention to the highway building project industry, the road building, the...
READ MOREAdjustment of economic policy under the new economic situation, the Malaysian government. Many investors want to know The Hydraulic schematic primary...
READ MORE